Water jet cutting machine high-pressure pump maintenance:
1 lubricants required power end of the injection.
2 New pump or pump factory overhaul, the first oil change is 500 hours, after every 3,000 hours or running quality lubricating oil change.
3 release of pressure relief valves periodic inspection and correction of 1.08 to 1.1 times the rated working pressure.
4. Regularly check the accuracy of the gauge.
5. Regularly check the tightness of the belt.
6 Replace damaged consumables.
7 Adjust the various parts of the
gap, check and tighten all the screws.
8 requires long-term disabled pump (especially sewage pumps),
application rinse, liquid pump body exhausted, all valves washable anti-embroidered coat oil, and the entire pump corrosion maintenance.
9 To enable parked longer pump, the pump response to conduct a comprehensive inspection
and
maintenance, or can not be enabled.
10 high pressure pump overhaul period is tentatively scheduled for 12,000 hours.